Skip to content
AB Innovative Technologies

Capability

R&D & Testing

Functional, environmental and durability testing supported by structured data analysis and design feedback loops.

A design is only finished when it has been proven. Our testing programme puts products through the conditions they will actually meet, then feeds the results back into the design so each revision is measurably better than the last.

At a glance

  • Functional and performance verification
  • Thermal and load stress testing
  • Durability and life testing
  • Structured failure analysis
An engineer measuring a power unit under test with a multimeter and oscilloscope

01

Testing programme

  1. STEP 01

    Product design validation

    Software-based design and planning of new products, checked against the original requirement set at each revision.

  2. STEP 02

    Prototyping

    Early test models are built to observe how the design behaves outside simulation.

  3. STEP 03

    Functional testing

    Trials confirm that the product performs to specification across its intended operating range.

  4. STEP 04

    Stress and durability testing

    Units are exposed to extreme heat, cold and heavy loads to establish real margins rather than assumed ones.

  5. STEP 05

    Data analysis

    Test results are reviewed systematically to isolate the cause of any failure and drive the next design iteration.

Start a project

Need r&d & testing?

Send your drawings or a description of the assembly and we will confirm feasibility, approach and timeline.